摘要 |
PROBLEM TO BE SOLVED: To construct an elevated section, a ramp section and an approaching section, utilizing a narrow working space effectively without generating a traffic jam, during a process of building a new highway bridge having a plurality of traffic lanes over an existing road. SOLUTION: The ramp section 2 is composed in such a way that a pair of left and right main girders 4 from both ends of the elevated section down to the ground are arranged closely to each other to have a width not too narrow to regulate the traffic on the ground, so that the passage of vehicles even during the construction period is not impeded. Later, the distance between the main girders 4 is opened and a slab 8b is fit into the space 13 to form the final girder width. COPYRIGHT: (C)2005,JPO&NCIPI
|