摘要 |
PROBLEM TO BE SOLVED: To provide an anchor bolt setting method enabling completion of foundation in a short construction period, while preventing the movement of anchor bolts by placing concrete in a form. SOLUTION: This structure 1 is arranged in a concrete placing space part in a self-standing state, by using the anchor bolt preset structure 1 of integrally erecting the anchor bolts 3 on a base body 2 composed of precast concrete. The structure 1 may be integrated by embedding a lower end part of the anchor bolt 3 in the concrete of the base body 2, and a screw body 4 is integrally embedded in the concrete of the base body 2, and the anchor bolt 3 may be removably integrated with the base body, by threadedly engaging its lower end screw part 3b with the screw body 4 of the base body 2. COPYRIGHT: (C)2005,JPO&NCIPI
|