发明名称 |
GAS TURBINE DEVICE AND ITS BLEEDING OPERATION METHOD |
摘要 |
PROBLEM TO BE SOLVED: To suppress the fluctuation of pressure in an external installation as an air supply destination in the process of change-over into bleed air from the outlet of a gas turbine compressor. SOLUTION: A compressor outlet pressure gauge 50 measures a compressor outlet pressure P2 and a gas turbine exhaust gas temperature gauge 52 measures a gas turbine outlet temperature T4. A turbine inlet mass flow rate is calculated after required bleeding. Then, a fuel flow control valve 35 controls a fuel flow rate and an inlet guide blade 1 controls a compressor inlet air mass flow rate. Thereby, bleeding is allowed corresponding to a flow rate and pressure required by the external installation. COPYRIGHT: (C)2005,JPO&NCIPI
|
申请公布号 |
JP2005105848(A) |
申请公布日期 |
2005.04.21 |
申请号 |
JP20030336655 |
申请日期 |
2003.09.29 |
申请人 |
HITACHI LTD;HITACHI ENGINEERING & SERVICES CO LTD |
发明人 |
KIDA ARATA;SUGITA NARIHISA;FUKUHARA HIROSHI |
分类号 |
F01D17/00;F02C3/30;F02C6/08;F02C7/057;F02C7/22;F02C9/18;(IPC1-7):F02C6/08 |
主分类号 |
F01D17/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|