摘要 |
The stabilized earth or reinforced soil structure comprises a fill, a facing placed along a front face of the structure, main reinforcements disconnected from the facing and extending in a reinforced zone of the fill situated behind the front face, and secondary elements connected to the facing and extending in a zone of the fill which exhibits, with the reinforced zone, a common part where loads are transmitted between the main reinforcements and the secondary elements by the material of the fill.
|