发明名称 BUILDING FLOOR STRUCTURE OF NUCLEAR POWER PLANT
摘要 PROBLEM TO BE SOLVED: To shorten a construction period due to being many in works performed at a job site, such as bar arrangement work, form work, concrete placing work, steel frame laying work, and cable laying work, in a building floor structure of an assembled floor structure of an upper-lower two-stage structure constituted on a reinforced concrete floor out of a reinforced concrete beam and H shape steel. SOLUTION: Reinforced concrete 11 is placed on a building underfloor part formed of a steel plate 10. A reinforcing member 13 is arranged for supporting a floor load when placing the concrete. This reinforcing member 13 is formed into a support structure of an apparatus 4 supported on a floor. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005097929(A) 申请公布日期 2005.04.14
申请号 JP20030331969 申请日期 2003.09.24
申请人 TOSHIBA CORP 发明人 HASHIMOTO FUMITOSHI
分类号 E04B5/23;E04B5/40;E04B5/43;G21C13/00;(IPC1-7):E04B5/23 主分类号 E04B5/23
代理机构 代理人
主权项
地址