发明名称 Method of constructing a pile foundation
摘要 <p>A method of constructing a pile foundation, wherein a foundation structure (1) is built on the ground (2), and has at least one through hole (4), and a connecting member (5) fixed to the foundation structure (1), adjacent to the hole (4), and having at least one portion (7) projecting upwards; a pile (3) is inserted through the hole (4); and a number of thrusts are applied statically on the pile (3), to drive the pile (3) into the ground (2), by means of a thrust device (21), which is located over the pile (3), cooperates with a top end (22) of the pile (3), and is connected to the projecting portion (7) of the connecting member (5) which, when driving the pile, acts as a reaction member for the thrust device (21).</p>
申请公布号 AU2003274706(A2) 申请公布日期 2005.04.11
申请号 AU20030274706 申请日期 2003.09.24
申请人 SO.L.E.S. SOCIETA' LAVORI EDILI E SERBATIO S.P.A. 发明人 VINCENZO COLLINA;LAMBERTO ZAMBIANCHI;ROBERTO ZAGO
分类号 E02D27/48;E02D5/28;E02D5/48;E02D5/52;E02D27/12 主分类号 E02D27/48
代理机构 代理人
主权项
地址