<P>PROBLEM TO BE SOLVED: To provide a system for designating the delivery dates of members capable of managing a variety of construction processes at different levels, to correct the schedule of construction work, the delivery dates of the members, the kinds of members and the like. <P>SOLUTION: This system comprises a small-process database for accumulating the names of small processes, into which the construction work of a building is subdivided; a large-process database for accumulating the names of large processes each consisting of the small processes; a CAD database for accumulating the building's CAD data; a member database for accumulating member data; a process day database for accumulating the number of days for each small process; a process selection means for extracting the names of small processes constituting the large process whose name has been selected; an end date determining means; a member determining means for determining the members for use in the small process selected or extracted and the number of each member; and a delivery date designating means for designating the determined members and the delivery of each member by the number determined. <P>COPYRIGHT: (C)2005,JPO&NCIPI |