发明名称 SOIL NAILING BY EXTENDED PACKER GROUTING AND CONSTRUCTION METHOD
摘要 A packer type soil nail body and a construction method are provided to restrict relaxation between a packer body and a boring hole ground by installing the packer body around a nail, and to stabilize the ground by grouting between the packer body and the boring hole at low pressure and grouting gradually through a grouting injection pipe. A packer type soil nail body is composed of a nail(10), first, second, third, fourth and fifth packing members combined with the nail by penetration holes, a packer(40) surrounding outer peripheries of the packing members combined with the nail and sealing the packing members with first, second, third and fourth packer bodies(41~44), an outer grouting injection pipe(38) fitted to the packing member outside the packer to inject grout at low pressure, a first grouting injection pipe penetrating the first packing member and injecting grout to the first packer body, a second grouting injection pipe penetrating the first and second packing members and injecting grout to the second packer body, a third grouting injection pipe penetrating the first, second and third packing members and injecting grout to the third packer body, and a fourth grouting injection pipe penetrating the first, second, third and fourth packing members and injecting grout to the fourth packer body.
申请公布号 KR20050029951(A) 申请公布日期 2005.03.29
申请号 KR20030066238 申请日期 2003.09.24
申请人 HAN JU GEOLOGICAL ENGINEERING CO.,LTD. 发明人 HONG, WON PYO;KANG, MOON KI;KIM, WUN KI;LIM, YU JIN
分类号 E02D5/80;(IPC1-7):E02D5/80 主分类号 E02D5/80
代理机构 代理人
主权项
地址