摘要 |
PROBLEM TO BE SOLVED: To use a banking construction method for banking and fairing of a slope face, by improving its dynamic characteristic, even if on-site excessive soil is defective. SOLUTION: This banking construction method is characterized by fairing the slope face by using improved soil, by forming the improved soil by mixing and agitation, by spraying, laying and leveling a solidifying material on on-site excessive soil. This banking construction method of the slope face is particularly effective when the soil generated at the job site is Shirasu. A cement type solidifying material, cement or lime can be used as the solidifying material. The cement is advantageous to sandy soil, and the cement type solidifying material is advantageous to sandy silt, and the lime is advantageously used to viscous soil. COPYRIGHT: (C)2005,JPO&NCIPI
|