摘要 |
PROBLEM TO BE SOLVED: To provide a grade separation construction method for shortening construction term and a period of traffic interruption time greatly. SOLUTION: This method comprises a bridge pier construction process for constructing a foundation for a bridge pier and the bridge pier, a main beam assembly process for assembling a main beam segment in a central span part, a gantry frame assembly process for pulling up a main beam for assembling a gantry frame for pulling up the main beam, a pulling-out process for pulling out the assembled main beam to a crossing road, a pulling-up process for pulling up the main beam by a jack attached to the gantry frame for pulling up the main beam, a lateral beam pulling-up process for pulling up a bridge pier lateral beam, a connection process for connecting the bridge pier lateral beam with the bridge pier to form the gantry bridge pier, and a bridging process for bridging the main beam on the gantry bridge pier. Consequently, the construction term can be shortened and the period of traffic interruption time can be greatly shortened. COPYRIGHT: (C)2005,JPO&NCIPI
|