发明名称 GRADE SEPARATION CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a grade separation construction method for shortening construction term and a period of traffic interruption time greatly. SOLUTION: This method comprises a bridge pier construction process for constructing a foundation for a bridge pier and the bridge pier, a main beam assembly process for assembling a main beam segment in a central span part, a gantry frame assembly process for pulling up a main beam for assembling a gantry frame for pulling up the main beam, a pulling-out process for pulling out the assembled main beam to a crossing road, a pulling-up process for pulling up the main beam by a jack attached to the gantry frame for pulling up the main beam, a lateral beam pulling-up process for pulling up a bridge pier lateral beam, a connection process for connecting the bridge pier lateral beam with the bridge pier to form the gantry bridge pier, and a bridging process for bridging the main beam on the gantry bridge pier. Consequently, the construction term can be shortened and the period of traffic interruption time can be greatly shortened. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005060959(A) 申请公布日期 2005.03.10
申请号 JP20030289929 申请日期 2003.08.08
申请人 FUJI PS CORP 发明人 SUGANO NORITAKA;FUKAYA HIROSHI;TSUTSUMI TADAHIKO
分类号 E01D21/00;E01D2/00;(IPC1-7):E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址