发明名称 CONSTRUCTION METHOD OF DRAINABLE SCENERY PAVEMENT
摘要 PROBLEM TO BE SOLVED: To provide a construction method of a drainable scenery pavement capable of quickly obtaining excellent scenery by clearly expressing a color of colored aggregate on the road surface in the case of construction work and, at the same time, easily obtaining a pavement enabling a drainage function and a low noise function to hold for a long period of time. SOLUTION: The construction method of the drainable scenery pavement expressing a color of aggregate on the road surface is constituted by using the colored aggregate as coarse aggregate in a drainable paving asphalt mixture. It is constituted of a process for paving the drainable paving asphalt mixture containing the colored aggregate 14 and a high viscosity binder at least 25,000 Pa s of viscosity at 60°C, a process for forming a resin membrane 13 in a surface layer part 12 by applying a reinforced resin on the surface layer part 12 of the pavement 11 by the drainable paving asphalt mixture to be paved and a process for grinding to eliminate the resin membrane 13 formed on the surface of the pavement 11 by water jet together with the hardened high viscosity binder. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005054359(A) 申请公布日期 2005.03.03
申请号 JP20030205307 申请日期 2003.08.01
申请人 OBAYASHI ROAD CORP 发明人 OGASA YUKIO;HORI HIROAKI
分类号 E01C7/26;E01C11/24;E01C23/08;E01C23/085;(IPC1-7):E01C7/26 主分类号 E01C7/26
代理机构 代理人
主权项
地址