发明名称 REINFORCEMENT METHOD FOR EARTH EMBANKMENTS OF WATERED HYDRAULIC STRUCTURES
摘要 FIELD: building, particularly hydraulic structure reinforcement. ^ SUBSTANCE: method is performed in two-stages. The first stage involves forming vertical elongated flat ground massifs secured by hardening material. Massifs are created in crest embankment area and in upper area of embankment slope so that massifs are spaced minimal available distance from crest and pass through embankment body, including land-sliding upper embankment slope area. Massifs are anchored in mineral bottom by lower edges thereof and are arranged at least in three rows and there are at least three massifs in each row. Method for massifs forming involves driving double-slotted injectors directly in embankment ground or in wells formed in embankment and having plugged wellhead; orienting injector slots perpendicular to hydraulic pressure head vector direction in embankment area to be reinforced; injecting hardening material under increased pressure across horizons from top to bottom or in reverse direction, wherein injection is initially performed under 5-15 atm pressure and at minimal rate in each second injector of one outermost row beginning from extreme ones; feeding hardening material in previously missed injectors in this row; supplying injectors of another extreme row with hardening material in the same way; feeding hardening material to ejectors of medium rows under 10-20 atm pressure; performing the second reinforcement stage as material hardens to obtain 70% strength. The second reinforcement stage involves forming vertical elongated flat massifs of secured ground anchored in mineral bottom by lower edges thereof and arranged at least in three rows, wherein each one includes at least three massifs. Massifs extend at the angle exceeding embankment slope angle to horizontal line. Massifs are formed with the use of double-slotted injectors in remainder embankment area. Injector slots are directed perpendicular to hydraulic pressure head vector direction in embankment area to be reinforced. Hardening material is ejected in above succession, wherein hardening material pressure is equal to design process pressure enough for direction of feeding hardening material through injector slots and lesser than hardening material injection pressure of the first reinforcement stage. ^ EFFECT: increased reliability of structure reinforcement; prevention of land-slide on structure slopes. ^ 3 cl, 3 dwg
申请公布号 RU2246582(C1) 申请公布日期 2005.02.20
申请号 RU20030125263 申请日期 2003.08.14
申请人 发明人 LOBOV O.I.;MEL'NIKOV B.N.;IVANENKO V.I.;SHERSTJUK S.L.
分类号 E02B3/12;E02D17/20 主分类号 E02B3/12
代理机构 代理人
主权项
地址