摘要 |
FIELD: mining industry. ^ SUBSTANCE: method includes preparation of slanted extraction fields, driving transport drifts, driving ventilation drifts for upper extraction field and use of transport drift of upper extraction field as ventilation during preparation of lower extraction field, driving two chambers through block in parallel to transport drift. Lower chamber is driven with advance relatively to transport drift and to upper chamber and with slant, providing for free flow of water from transport drift and both chambers. Transport drift is periodically filled with breakthroughs to upper chamber, which is by breakthroughs connected to lower chamber. Width of lower chamber is set in accordance to condition of placement of working tool of technological extraction complex therein, and width of upper chamber - from condition of placement of rock therein which is product from driving of transport drift. Transport drift and both chambers are driven with straight preparation and extraction order of extraction fields, using solid system of extraction fields extraction. ^ EFFECT: higher intensiveness of operation. ^ 3 dwg |