发明名称
摘要 PROBLEM TO BE SOLVED: To stabilize performance of a hopper device by providing a certain time lag between the opening of a water feed solenoid valve and the closing of a solenoid vent valve in an operation of supplying hot water. SOLUTION: When water discharging operation is finished, a water feed solenoid valve 9 provided in a first hot water supply pipe 7 of a hot water supply circuit (C) is opened. Combustion of a burner 4 of a hot water supply apparatus (A) is started and a solenoid vent valve 32 provided in a vent pipe 30 of a hopper device (D) is closed and hot water supply control is effected. Hot water flows from the hot water supply apparatus (A) to a switching valve (V) via the first hot water supply pipe 7, the water feed solenoid valve 9, the hopper device (D) and a second hot water supply pipe 8 of the hot water supply circuit (C). Then, the flow from the switching valve (V) is divided into a circuit passing from a heat exchanger 17 through a supply pipe 14 and a circuit to a return pipe 15 via a bypass line 19 and the hot water is supplied through two lines of the supply pipe 14 and the return pipe 15. At this time, a certain time lag, e.g. about 1 second is provided between opening of the water feed solenoid valve 9 and closing of the solenoid vent valve 32. Air within the hopper device (D) is relieved into open air and closing of the solenoid vent valve is stabilized.
申请公布号 JP3619917(B2) 申请公布日期 2005.02.16
申请号 JP19960156115 申请日期 1996.05.28
申请人 发明人
分类号 F24H1/00;F24H1/46 主分类号 F24H1/00
代理机构 代理人
主权项
地址