发明名称 CONSTRUCTION METHOD FOR RETAINING WALL
摘要 PROBLEM TO BE SOLVED: To provide a construction method for a retaining wall which can be built with a simple manner by considering water drainage from a high side of the ground level. SOLUTION: A difference between an integer times the length of a retaining wall unit 91 and the length of the retaining wall is adjusted by connecting portions 95 which is made by solidifying gravel (water permeable) with binders such as mortar, resin or the like; and they are also utilized as weep-holes. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2005036641(A) 申请公布日期 2005.02.10
申请号 JP20040184647 申请日期 2004.06.23
申请人 FUJI AUTETSUKU:KK;OKUNO KOICHI 发明人 SAITO EIZO;OKUNO KOICHI
分类号 E02D29/02;(IPC1-7):E02D29/02 主分类号 E02D29/02
代理机构 代理人
主权项
地址