摘要 |
<P>PROBLEM TO BE SOLVED: To provide a clamping device of a flexible tube capable of evading the situation that the interruption of the flow of fluid in the flexible tube becomes insufficient by a guide wall at the time of clamping, and improving the workability of clamping. <P>SOLUTION: The clamping device of the flexible tube comprises one end part 2 provided with a first projection part 6, the other end part 3 provided with a second projection part 7, an intermediate part 10 continued to one end part 2 and the other end part 3, and an engaging part 3a for engaging one end part 2. The flexible tube C is clamped by engaging one end part 2 with the engaging part 3a while deflecting the intermediate part 10 in a state where the flexible tube C is inserted between the first projection part 6 and the second projection part 7, and the flow of the fluid at the part is interrupted. The guide wall 8 for guiding one end part 2 to the engaging part 3a is erected from the edge part of the first projection part 6 or the second projection part 7, and a projection part 9 for separating the flexible tube C from the guide wall 8 is positioned. <P>COPYRIGHT: (C)2005,JPO&NCIPI |