PROBLEM TO BE SOLVED: To improve the production efficiency of electric wire work jobs including hand works by simplifying the work jobs on the electric wires, and to carry out production management by measuring a working time needed for processing a piece of the electric wire. SOLUTION: In an electric wire processing management device 1, based on a database 8 in which data on kinds of wires, the order of working and working information on a plurality of electric wires to be worked are stored, an automatic cutting means 10 which cuts the electric wires and peels off insulation sheathing at both ends works the electric wires as desired, and a switching means 14a inputs signals on the completion of respective hand works on the electric wires cut and peeled by the automatic cutting means 10, and based on the completion signals from the switching means 14a, working data on the next electric wires to be worked are displayed at respective terminals 13, 14, 16 and 18 after consulting with the database 8, and thus the production efficiency is improved because work jobs of the electric wires are simplified. COPYRIGHT: (C)2005,JPO&NCIPI
|