摘要 |
PURPOSE: A method for making a drawing to make an HARP comprising an HRSG(Heat Recovery Steam Generator) is provided to prevent error through automatic calculation by minimally inputting data and design values for a basic design, and prevent waste of manpower and delay of manufacture due to modification of the design. CONSTITUTION: For making the HARP making drawing, a process for inputting/correcting data for a selection sheet, a design standard, and project information is performed by reading a standard value from a standard detail database(S63). A manufacturing cost and interference are optimized by processing design data with a calculation formula of the standard detail database(S64). The making drawing and a BOM(Bill Of Material) document result are output by using a standard drawing, a standard form, and an original drawing of the standard detail database(S65).
|