摘要 |
PROBLEM TO BE SOLVED: To provide a construction method improving work efficiency markedly, performing stable delivery and minimizing the reinforcement of an existing structure. SOLUTION: In this construction method for delivering the structure 1 by the joint use of a delivery mechanism 3 and a traction mechanism 4, the tension of a guide member W used for the traction mechanism 4 is detected, and the structure 1 is delivered by the delivery mechanism 3 and the traction mechanism 4 while maintaining the tension of the guide member W in a prescribed state. COPYRIGHT: (C)2005,JPO&NCIPI
|