发明名称
摘要 A ballast load control system and method is presented that regulates the output electrical power supplied by a turbo-generator such that appropriate turbine loading may be achieved. Such enables the use of a turbo-generator having an expansion turbine to be used to provide a controlled, required amount of cooling to a thermal control system. By effectively varying the coupled electrical load, the loading provided to the expansion turbine may be controlled while maintaining output power requirements to connected electrical utilization equipment. Use of a common system controller for both the cooling system and ballast trim load system of the present invention ensures coordinated operation between the required amount of cooling and electrical power quality supplied to the coupled utilization equipment.
申请公布号 JP2005501498(A) 申请公布日期 2005.01.13
申请号 JP20030524104 申请日期 2002.08.23
申请人 发明人
分类号 F01D17/00;F01D17/20;H02P9/02;H02P9/04;(IPC1-7):H02P9/04 主分类号 F01D17/00
代理机构 代理人
主权项
地址