发明名称 Hydrogen production from hydro power
摘要 A method is provided for operating a hydroelectric power generating facility configured for operating in first and second operating modes. The facility includes a turbine driven power generating unit receiving a flow of water through an upstream conduit to generate electrical power. The method comprises computing a first economic value for the generated electrical power when operating in the first operating mode, and computing a second economic value for the generated electrical power when operating in the second operating mode. The method further comprises comparing the first economic value with the second economic value to identify the operating mode that provides the higher economic value, and operating the turbine facility in the identified operating mode.
申请公布号 US6841893(B2) 申请公布日期 2005.01.11
申请号 US20040861688 申请日期 2004.06.04
申请人 VOITH SIEMENS HYDRO POWER GENERATION, GMBH & CO. KG;VOITH SIEMENS HYDRO POWER GENERATION, INC. 发明人 MAIWALD MARCO;MUELLER BERTRAM KURT
分类号 F03B3/06;F03B13/00;F03B15/00;(IPC1-7):H02P9/04 主分类号 F03B3/06
代理机构 代理人
主权项
地址