摘要 |
A water inlet and venting pipe of a water dispenser. The venting pipe is installed in the water dispenser. The venting pipe is partitioned into water inlet channel and venting channel by a partitioning board integrally formed with the venting pipe. At least one inlet aperture is formed on the venting pipe for connecting the water inlet channel, while a venting aperture is formed on the venting pipe for connecting the venting channel. Thereby, air in the water inlet pipe is vented to from the water dispenser to the venting channel via the venting aperture, and water a tank installed on the water dispenser flows into the water dispenser via the inlet aperture and the water inlet channel. As the venting pipe includes the inlet channel and the venting channel are integrally formed, the manufacturing process is simple since only one mold is required and no special tooling is necessary. Further, the gauges of the inlet pipe and the venting pipe are fixed, such that the flow of water or air is more fluent.
|