摘要 |
The present invention provides a method of constructing a room which is at least partially sunked in a ground, the method including: inserting a plurality of hollow elongate elements (11) provided with flanges (12,13) into the ground at a circumference of the room to be formed, providing a plurality of double wall panels (50), each double wall panel (50) being located between neighbouring elongate elements so as to form an at least partially enclosed space, excavating spoil from within the at least patially enclosed space so as to clear said partially enclosed space, providing an upstanding water stop (80) inside each of the double wall panels, and providing a substantially horizontal water stop (81) connected to at least some of the upstanding water stops. <??>The present invention also provides a sunken or partially sunken room thus obtained, and a kit of parts for making such room. <IMAGE> |