发明名称 UNDERGROUND SLAB CONSTRUCTION METHOD IN TOP-DOWN METHOD CONSTRUCTING FROM AN UPPER LAYER TO A LOWER LAYER GRADUALLY
摘要 PURPOSE: An underground slab construction method in a top-down method is provided to cut down the construction cost, and to reduce the construction period by constructing the slab and the step with the top-down method. CONSTITUTION: A support frame(10) of a lower layer and a slab form(20) are manufactured, and a suspension member(40) is combined with the support frame. The ground stop line is decided, and the ground is excavated. A wire(70) of a wire dropping unit(60) is combined with the suspension member, and the support frame and the slab form are placed on the ground by moving down the wire. The suspension member is drawn out of a tubular member(80), and a support frame fixing unit(30) is combined with the upper part of the concrete pouring finishing line. Concrete is poured and cured, and the tubular member and the support frame fixing unit are removed. The support frame and the form are removed by unwinding the wire.
申请公布号 KR20040104218(A) 申请公布日期 2004.12.10
申请号 KR20030035752 申请日期 2003.06.03
申请人 SAM JI CONSTRUCTION CO., LTD. 发明人 JIN, YONG SEOK
分类号 E04G11/38;(IPC1-7):E04G11/38 主分类号 E04G11/38
代理机构 代理人
主权项
地址