发明名称 PLANNING METHOD IN DIRECT DELIVERY DISTRIBUTION SYSTEM FROM PLANT
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a planning method for making the optimal delivery plan for linking delivery and production in a product distribution configuration to directly deliver products to a marketplace from the production final process of a plant without using any stock base point. <P>SOLUTION: This system is provided with a delivery planning means 104, a production request creation means 106, a production planning means 109, a delivery correction request creation means 112, and a delivery plan correcting means 113, and the optimal production delivery term is set on the basis of a delivery plan 105 created from order reception information from the market, and the latest production delivery term is set on the basis of the request delivery term of the order reception information, and when the optimal production delivery term is given priority but not satisfied, the latest production delivery term is considered to make a production plan 110 in a plant final process 114 on which the delivery plan 105 is reflected. Furthermore, as for the production plan 110 whose optimal production delivery term is not satisfied, the delivery plan 105 is corrected so that the production plan 110 and the delivery plan 114 are linked to each other. <P>COPYRIGHT: (C)2005,JPO&NCIPI</p>
申请公布号 JP2004341646(A) 申请公布日期 2004.12.02
申请号 JP20030135024 申请日期 2003.05.13
申请人 MATSUSHITA ELECTRIC IND CO LTD 发明人 WADA MASAYUKI;MIMAKI NOBUYUKI;KOMINAMI TAIZO
分类号 G05B19/418;B65G61/00;G06Q50/00;G06Q50/04;G06Q50/28;(IPC1-7):G05B19/418;G06F17/60 主分类号 G05B19/418
代理机构 代理人
主权项
地址