摘要 |
<P>PROBLEM TO BE SOLVED: To provide a method for surely preparing appropriate raw materials for respective works in a production process. <P>SOLUTION: This production management system 10 is provided with a work station 12(computer), a printer device 14 connected to the work station 12 for printing a two-dimensional code including operation information associated with a predetermined operation outputted from the work station 12, portable terminal equipment 16 for reading the two-dimensional code and a portable printer device 18 connected to the portable terminal equipment 16. The portable terminal equipment 16 acquires information associated with an operation by reading the two-dimensional code on an operation instruction C, and acquires information associated with raw materials by reading the two-dimensional code on the container or package M of raw materials, and compares those information. Then, the manufacturing management system 10 decides whether or not the raw materials to be used for the predetermined operation are prepared, and the result is reported to a person in charge. <P>COPYRIGHT: (C)2005,JPO&NCIPI |