发明名称 |
METHOD OF CONSTRUCTION FOR THE LOST BANK RECOVERY IN THE FIRST STAGE RAPIDLY BY A FREE-FALLING PILE USING POTENTIAL ENERGY AT THE APPOINTED HEIGHT |
摘要 |
PURPOSE: A method of construction for the lost bank recovery using a free-falling pile is provided to minimize the loss of lives and properties by restoring the lost bank in the first stage and constructing a pile structure composed of a free falling pile or many piles deeply to the ground of a bank not to be carried away by the speedy current. CONSTITUTION: The method of construction for the lost bank recovery using a free-falling pile(20) comprises: a weight pile(20) formed in the shape of a column whose length for preventing the lost of a bank(11) is twice as long as the height of a bank and the lower diameter is shorter than the upper diameter; and a helicopter(30) lifting up the pile(20) above the appointed height and piling to the ground by free-falling the pile(20) from the appointed height using potential energy.
|
申请公布号 |
KR20040099510(A) |
申请公布日期 |
2004.12.02 |
申请号 |
KR20030031508 |
申请日期 |
2003.05.19 |
申请人 |
LEE, KYUNG OK |
发明人 |
LEE, KYUNG OK |
分类号 |
E02B3/00;(IPC1-7):E02B3/00 |
主分类号 |
E02B3/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|