摘要 |
PURPOSE: A method for managing feasibility of a power plant field based on basic data inputted from a user is provided to offer a cash flow result window or a standard report by extracting data from a loan refundment plan and an estimated profit/loss statement, after fixing the loan refundment plan and making the estimated profit/loss statement based on the data inputted from the user. CONSTITUTION: The user inputs the basic data(S20). Based on the basic data, the loan refundment plan divided into sectors for calculating the load refundment plan and determining a loan input ratio during a construction term is fixed, and the estimated profit/loss statement is made(S22). The cash flow result window is output by extracting the data from the loan refundment plan and the estimated profit/loss statement, and the report attaching the extracted data is output by loading a report form if a report output command is received(S23).
|