发明名称 |
METHOD FOR AUTOMATICALLY CALCULATING CHARGE FOR CAPACITY UNIT OF NEW POWER PLANT |
摘要 |
PURPOSE: A method for calculating charge of a new power plant is provided to automatically calculate the charge by receiving data needed for calculating the charge such as an operation time and a discount rate with use of a program. CONSTITUTION: A controller receives charge calculation data such as the discount rate through an information input part(S1). The calculated charge is calculated by transferring the inputted data to a charge calculator(S2). The calculated charge is output through an information output part(S3).
|
申请公布号 |
KR20040100601(A) |
申请公布日期 |
2004.12.02 |
申请号 |
KR20030033016 |
申请日期 |
2003.05.23 |
申请人 |
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO., LTD. |
发明人 |
KIM, DAE JUNG |
分类号 |
(IPC1-7):G06F17/60 |
主分类号 |
(IPC1-7):G06F17/60 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|