摘要 |
PROBLEM TO BE SOLVED: To provide a method for creating a pile, which can bring about sufficient hardening strength with no unevenness, and which requires only short total working time. SOLUTION: Filling work for a mixture to be turned into a hardened body is completed only by performing: boring work up to a target depth D<SB>X</SB>and soil discharge/recovery work (a1-a7); mixing work (a8) on the ground, which is to be performed by means of an automatic mixing device 9 in such a manner as to be independent of or overlap the soil discharge/recovery work, and refilling work (a9-a11) for the mixture after the completion of mixing; and soil compaction in the state of maintaining set back pressure P<SB>1</SB>, and operations (a12-a17) for pulling up a boring screw 2. A vertical motion of the boring screw 2 is reduced, and mixing processes are performed in a lump, so that required time from the start of boring to the completion of the filling of the mixture can be reduced. Additionally, the quality of the pile after hardening is assured by uniforming the mixing. COPYRIGHT: (C)2005,JPO&NCIPI
|