发明名称 |
CONSTRUCTION METHOD FOR A BRIDGE BY INCREMENTAL LAUNCHING METHOD USING A HORIZONTAL SHIFT UNIT OR A HORIZONTAL FORCE TRANSMISSION UNIT |
摘要 |
PURPOSE: A construction method for a bridge by ILM(Incremental Launching Method) using a horizontal shift unit is provided to apply for the horizontal alignment of a bridge having various curved shapes by receiving the horizontal force of an upper structure of a bridge and making horizontal movement possible. CONSTITUTION: The construction method for a bridge by ILM(Incremental Launching Method) using a horizontal shift unit comprises the steps of: completing the extrusion of an upper structure(300a) in a lower structure by manufacturing and extruding segments for an upper structure of a bridge continuously in a mold manufactory; installing a first bridge on a lower structure of parallel bridges installed next to the extruded upper structure(300a) by moving the extruded upper structure(300a) horizontally using a horizontal shift unit(400) installed between lower structures; and completing parallel bridges by manufacturing and extruding segments for an upper structure of a bridge in the same mold manufactory again.
|
申请公布号 |
KR20040100083(A) |
申请公布日期 |
2004.12.02 |
申请号 |
KR20030032292 |
申请日期 |
2003.05.21 |
申请人 |
AN, CHANG IL |
发明人 |
AN, CHANG IL |
分类号 |
E01D21/00;(IPC1-7):E01D21/00 |
主分类号 |
E01D21/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|