发明名称 LEAD TIME MANAGING METHOD AND LEAD TIME MANAGING PROGRAM
摘要 <P>PROBLEM TO BE SOLVED: To provide a lead time managing method and a lead time managing program for executing much more appropriate supply chain management. <P>SOLUTION: A manufacturing base point system 11, a physical distribution base point system 12 and a sales base point system 13 configuring a supply chain are connected to a lead time managing system 20. Those respective base point systems 11 to 13 are provided with a base point management data storing part 15 for storing management data such as a machine number, process and process execution date. The lead time managing system 20 is provided with a machine number data storing part 21 for storing management information such as the machine number, merchandise identifier and base point location classification. The lead time managing system 20 acquires the management data of the product from a base point management data storing part 15 of the respective base point systems 11 to 13 based on the specified machine number, and outputs the mean lead time and the comparison result. <P>COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004326481(A) 申请公布日期 2004.11.18
申请号 JP20030120955 申请日期 2003.04.25
申请人 RICOH CO LTD 发明人 ISHIBASHI AKIRA
分类号 G06Q10/06;G06Q10/00;G06Q10/10;G06Q30/06;G06Q50/00;G06Q50/04;G06Q50/10;G06Q50/28 主分类号 G06Q10/06
代理机构 代理人
主权项
地址