摘要 |
<p>The boiler has a processing-allowance reinforcement (6, 6') on at least one boiler section (1, 1'), fitted to the wall in the region of the hub (3, 3'). The sealing battens (4, 4') have an enlarged overlap region, , which is filled with sealing mass (5) to reach the seal on the hot gas side at both maximum and minimum processing allowance.</p> |