发明名称 TERMITE PREVENTION METHOD AND STRUCTURE AT FOUNDATION
摘要 PROBLEM TO BE SOLVED: To obtain superior termite prevention effect by surely arranging a termite prevention agent on a boundary part between a foundation and a dirt floor concrete placed in the inside. SOLUTION: A termite prevention method forms a gap 30 with intention by using a form 22 between the foundation 12 and the dirt floor concrete 18 placed in the inside, and puts the termite agent 20 in the gap 30. More preferably, a groove 11 is previously formed in ground 10 at the edge of the foundation to put the termite prevention agent 20 therein, and the termite prevention agent 20 and the termite prevention agent 20 in the gap 30 are continued. When the form 22 is installed, the form 22 can be easily removed by leaving a gap 23 between the form 22 and a foundation inside face 12a. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004308353(A) 申请公布日期 2004.11.04
申请号 JP20030106255 申请日期 2003.04.10
申请人 FUKUVI CHEM IND CO LTD 发明人 SATO SHIRO;HASEGAWA MOTONORI
分类号 E02D27/01;E04B1/72;(IPC1-7):E04B1/72 主分类号 E02D27/01
代理机构 代理人
主权项
地址