发明名称 UNDERGROUND TANK WORK EXECUTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide an underground tank work execution method for easily performing execution work of a side wall body structure by properly holding an attitude of an inside wall part of the side wall body structure. SOLUTION: Only an outside wall part 21 is arranged on an upper surface of a ground surface R as indicated in Fig.(a). The inside of the ground surface R is excavated, and sediment is discharged outside the outside wall part 21, and the outside wall part 21 is buried in a housing hole Rh as indicated in Fig.(b). Next, base concrete 50 is formed in a bottom part of the housing hole Rh, and the inside wall part 22 is installed on an upper surface of this base concrete 50. A column 14 is erected on an upper surface of a plate 51 as indicated in Fig.(c), and a wide-flange shape steel 52 is horizontally arranged. The side wall body structure 12 is constructed by forming an intermediate wall part by pouring ready-mixed concrete into a space G formed of an inner peripheral surface of the outside wall part 21 and an outer peripheral surface of the inside wall part 22. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004308271(A) 申请公布日期 2004.11.04
申请号 JP20030104138 申请日期 2003.04.08
申请人 MORIMATSU RESEARCH INSTITUTION CO LTD;KANCHI SOGO GIJUTSU KENKYUSHO:KK 发明人 MATSUHISA NOBUO;OGAWA HIROSHI
分类号 E02D29/045;B65D88/06;B65D88/76;B65D90/00;E21D13/00;(IPC1-7):E02D29/045 主分类号 E02D29/045
代理机构 代理人
主权项
地址