发明名称 CONSTRUCTION METHOD FOR BEARING WALL
摘要 PROBLEM TO BE SOLVED: To provide a construction method for a bearing wall, which enables a shear key to be simply formed in a vertical placing joint part of a central wall of the bearing wall to be precedently constructed. SOLUTION: In this construction method for the bearing wall, a form 1 for forming the central wall 16 of the bearing wall to be precedently constructed is assembled and formed on a floor surface 5 between columns 4 in such a manner as to cover a wall reinforcement 2, a shear key forming member 10 is installed between horizontal wall reinforcements 6 at both ends of a side plate 8 of the form 1, an expanded tube 12 is installed outside the member 10, and after that, concrete 15 is placed in the form 1. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004308156(A) 申请公布日期 2004.11.04
申请号 JP20030100307 申请日期 2003.04.03
申请人 TODA CONSTR CO LTD 发明人 IZUMI NOBUYUKI;HAMADA SATOSHI;WATABE YASUNAO
分类号 E04B1/16;E04B2/84;E04G9/10;(IPC1-7):E04B2/84 主分类号 E04B1/16
代理机构 代理人
主权项
地址
您可能感兴趣的专利