摘要 |
PROBLEM TO BE SOLVED: To provide a machine tool system, efficiently operating two loaders according to machining when raw material works are fed one by one at equal intervals from an upstream process. SOLUTION: This machine tool system includes: a machine tool 3 including first and second machining parts 1, 2; a work temporary placing part F provided near these machining parts 1, 2; and first and second loaders 21, 22. The first loader 21 receives the raw material work W at a carry-in part 5, replaces the raw material work W for a machined work to be carried to a first machining part 1, temporarily places the machined work in a work temporary placing part F, and returns to the carry-in part 5. The first loader receives a raw material work W from the carry-in part 5 and carries in the same in the work temporary placing part F. The second loader 22 carries out the machined work temporarily placed in the work temporary placing part F to the carry-out part 6. The raw material work temporarily placed in the work temporary placing part F is received and the raw material work is replaced for the machined work to be carried in the second working part 2. COPYRIGHT: (C)2005,JPO&NCIPI
|