发明名称 PUMPING INSTALLATION
摘要 PROBLEM TO BE SOLVED: To prevent the locking of an impeller by preventing the occurrence of galling between the impeller and a wall surface in a pump chamber. SOLUTION: In the pumping installation for accommodating the impeller 1 in the pump chamber 3, the impeller 1 and at least one of sections 10, 11 that oppose the impeller 1 on a wall inside the pump chamber 3 are formed by an nickel group corrosion-resistant alloy. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004300992(A) 申请公布日期 2004.10.28
申请号 JP20030093889 申请日期 2003.03.31
申请人 MIURA CO LTD 发明人 ITABASHI AKIYOSHI;UEDA SEIICHI;WAKANA KENICHIROU
分类号 F04D5/00;F04D29/42;(IPC1-7):F04D5/00 主分类号 F04D5/00
代理机构 代理人
主权项
地址