发明名称 CARRYING WORK PLANNING METHOD
摘要 <P>PROBLEM TO BE SOLVED: To provide a carrying work planning method for efficiently allocating transporting works to transportation vehicles each having a cargo loading part and a traction part separatable from each other in distribution susceptible to cargo loading/unloading working time at a carry source and a carry destination, such as transportation of heavy loads. <P>SOLUTION: The carrying work planning method comprises (a) a step of estimating a loading/unloading working time at the carry source and the carry destination, (b) a step of assembling transporting works being the same in the carry source, the carry destination and the cargo loading part to form a transportation set, (c) a step of selecting the transporting works in the same numbers from the transportation set to form groups and combining the groups to form a temporary working set, (d) a step of forming as a working set, the temporary working set in which a time difference between a time for the transportation vehicle to go round a route and the loading/unloading working time at the carry source and the carry destination is smaller than a reference value, and (e) a step of determining an execution time and allocating the working set. <P>COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004292077(A) 申请公布日期 2004.10.21
申请号 JP20030083745 申请日期 2003.03.25
申请人 JFE STEEL KK 发明人 TOMIYAMA SHINJI;OKAWA TOSHIO
分类号 B65G61/00;B65G63/00;G06Q30/06;G06Q50/00;G06Q50/28;G08G1/00 主分类号 B65G61/00
代理机构 代理人
主权项
地址