发明名称 BRIDGE BEAM REINFORCEMENT METHOD AND DEVICE, FOR PREVENTING CRACK AND CORRECTING DEFLECTION IN PC BEAM OF FLOOR SLAB
摘要 PURPOSE: A bridge beam reinforcement method and a device are provided to prevent a crack by straightening and correcting deflection of PC(Precast) beams caused by long-term use of the PC beams and to prevent progress of the crack formed. CONSTITUTION: PC beams(3,4) are arranged to the bottom of a floor slab put on between piers(1,2) of a bridge to support and reinforce the floor slab. A bridge beam reinforcement method prevents a crack of the PC beams by pulling and straightening both ends of a steel strand(7) fixed to the PC beams and prevents progress of the crack formed. The bridge beam reinforcement method comprises steps of connecting adjoining PC beams by the steel strand; simultaneously pulling and tensing both ends of the steel strand situated to the center of the PC beams by cylinders(8); and fixing the ends of the tensed steel strand to the tensed positions to make the deflection of PC beams corrected.
申请公布号 KR100450591(B1) 申请公布日期 2004.09.17
申请号 KR20030100138 申请日期 2003.12.30
申请人 KI HAE TECH CO., LTD.;PARK, HO WAN 发明人 PARK, HO WAN
分类号 E01D22/00;(IPC1-7):E01D22/00 主分类号 E01D22/00
代理机构 代理人
主权项
地址