摘要 |
PROBLEM TO BE SOLVED: To improve the uniformity of the time to process the thickness of an oxide film by calculating an optimum oxidation processing time in a process managing system from the oxidizing time, film thickness data and atmospheric pressure data at previous processing time in the atmospheric pressure data at a process starting time, a film thickness value aimed at its process and the same oxidizing process Job when a thermal oxidation process is started. SOLUTION: This optimizing system of the film forming time includes, as shown in Fig., a step managing system (HOST computer, host computer) 10 for managing a thermal oxidation process, etc., a unit (barometer) 20 having a barometer, a thermal oxidation processing unit 30, and a film thickness measuring unit 40. The HOST computer 10 is connected to the barometer 20, the thermal oxidation processing unit 30 and the film thickness measuring unit 40 via a network to transmit and receive data to and from the respective units. COPYRIGHT: (C)2004,JPO&NCIPI
|