摘要 |
<P>PROBLEM TO BE SOLVED: To solve a problem that much time and man-hours are required for deciding a product structure satisfying request structure/delivery date in a method for supporting a design of a system satisfying the request structure/delivery date at the time of estimating the structure of a product. <P>SOLUTION: The method has a step for receiving input of a manufacture schedule pre-result of the product, cost of the product, related product information and shipping time, a step for confirming a premise product of product structure inputted from an inquiry terminal, a step for judging shipping propriety of the respective products of the confirmed structure, inquiring product shipping of a manufacture information server when product shipping time is not matched with the delivery date and retrieving a substitute so as to map out the structure and a step for outputting the mapped-out structure as the structure being an object of a proposal. <P>COPYRIGHT: (C)2004,JPO&NCIPI |