摘要 |
A method for the operation of an elevator installation, wherein the operating parameters for achieving a desired performance are determined by simulation of the operation of the elevator installation, the operating parameter and the desired performance are included in a protocol, the elevator installation is operated with the operating parameter, the actual performance produced by the elevator installation is measured and the actual performance is compared with, the desired performance. |