发明名称 MATERIAL PROCUREMENT AND CONSTRUCTION PLAN INTEGRATED PROJECT MANAGEMENT SYSTEM
摘要 <P>PROBLEM TO BE SOLVED: To provide a system capable of unitarily managing information on ordering, transportation and on-site management of materials in step with a project. <P>SOLUTION: The system automatically lists materials required for each unit work process (work package) at the bottom of the work hierarchy in a project management program using attributes unique to the materials created on a 3-dimensional model (kind, quality, weight, measurement, transportation method, installation area/floor, etc.), and utilizes them for a material procurement plan, carrying-in of the materials to a work site, and management of the materials on site. When there occurs a change or an addition of design, listing of materials is automatically carried out by execution of correction on the model, of which records are unitarily managed. The system reduces human work and enables accurate listing and ordering of materials to be made in a short time. <P>COPYRIGHT: (C)2004,JPO&NCIPI
申请公布号 JP2004234338(A) 申请公布日期 2004.08.19
申请号 JP20030022221 申请日期 2003.01.30
申请人 HITACHI LTD 发明人 KATAGIRI SHIYUUSHIN;SHIMIZU AKIHIRO
分类号 G06Q50/08;G06Q10/00;G06Q10/06;G06Q30/06;G06Q50/00 主分类号 G06Q50/08
代理机构 代理人
主权项
地址