发明名称 |
METHOD FOR CONTROLLING QUEUE TIME CONSTRAINTS IN A FABRICATION FACILITY |
摘要 |
<p>An algorithm can be performed to control the dispatch of products in a fabrication or manufacturing facility. The queue time constraint tolerances and tool throughput are initialized for each product. Next the multiple processing demand time can be calculated for each product. The aggregating queue time constraint can then be calculated for each product. If the multiple processing demand time is less than the aggregating queue time constraint for each queue time limit tool, then any lot can be selected to be processed. Otherwise, the product at the given tool should be further processed.</p> |
申请公布号 |
SG105006(A1) |
申请公布日期 |
2004.07.30 |
申请号 |
SG20030003051 |
申请日期 |
2003.05.30 |
申请人 |
TAIWAN SEMICONDUCTOR MANUFACTURING CO., LTD |
发明人 |
LIANG-KAI HUANG;SPAN LU;REN-CHYI YOU;KUANG-HUAN HSU |
分类号 |
G06Q10/06;(IPC1-7):G06F19/00 |
主分类号 |
G06Q10/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|