发明名称 ENCLOSURE SHUTOFF CONSTRUCTION METHOD FOR L-SHAPED FORM AND U-SHAPED FORM
摘要 PROBLEM TO BE SOLVED: To largely reduce costs and a construction period without requiring installation of a temporary bridge and a working platform; and to restrain influence on the environment by providing a construction method of using no heavy machinery, sheet pile and master pile at all, and providing a construction method of carrying out no excavating earth 3. SOLUTION: The temporary bridge and the working platform are not installed; driving and excavation are not performed by the heavy machinery; and the excavating earth is not carried out. Stairs and a hoist are arranged on the upstream/downstream side of a pier. An L-shaped form and a U-shaped form are immersed in a surrounding riverbed, and are enclosed. Waling is installed on a vertical wall of the L-shaped form and the U-shaped form, and a strut and a brace are installed from the pier. An impervious sheet is stretched over the inner-outer periphery of the L-shaped form and U-shaped form. A groove is excavated on the riverbed around the pier. The excavating earth is loaded on a bottom plate of the L-shaped form and the U-shaped form. Water in the groove is drained. COPYRIGHT: (C)2004,JPO&NCIPI
申请公布号 JP2004211420(A) 申请公布日期 2004.07.29
申请号 JP20020383836 申请日期 2002.12.28
申请人 FUJIMAKI MASAYOSHI 发明人 FUJIMAKI MASAYOSHI
分类号 E02D23/02;E02D23/08;(IPC1-7):E02D23/02 主分类号 E02D23/02
代理机构 代理人
主权项
地址