发明名称 COKE DRY QUENCHING FACILITY
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a CDQ which has the improved maintainability of its gas circulating blower and can have the gas circulating system constituted in an economical layout. <P>SOLUTION: The coke dry quenching (CDQ) facility has a circulating gas line formed by concatenating a cooling tower 1, a primary dust remover 3, a waste heat boiler 2, a secondary dust remover 6, a gas circulating blower 8, and the cooling tower 1 in turn to provide a closed loop through which the gas cooling red-hot coke flows in the above order of the connections. In the facility, the number of gas lines from the lower part of the waste heat boiler 2 to the secondary dust remover 6 is limited to one, and a straightening vane is arranged in a part of the gas line connecting to the lower part of the boiler 2. <P>COPYRIGHT: (C)2004,JPO&NCIPI</p>
申请公布号 JP2004210979(A) 申请公布日期 2004.07.29
申请号 JP20030000483 申请日期 2003.01.06
申请人 NIPPON STEEL CORP;NITTETSU PLANT DESIGNING CORP 发明人 OGINO YOSHIZO
分类号 C10B39/02;F27D17/00;(IPC1-7):C10B39/02 主分类号 C10B39/02
代理机构 代理人
主权项
地址