发明名称 CONSTRUCTION METHOD OF CROSS GIRDER-INTEGRATED CONCRETE FLOOR SLAB
摘要 PROBLEM TO BE SOLVED: To provide a construction method of a concrete floor slab, which enables a form for the concrete floor slab to be rationally provided by effectively utilizing a cross girder arranged between steel main girders, in the construction of a steel girder bridge with a long interval between the steel main girders. SOLUTION: The cross girders 11 are arranged at intervals between the steel main girders 10 and 10 which are arranged in parallel, so that both ends of the respective cross girders can be coupled to the steel main girders. After that, temporary girders 12 for supporting timbering, which are elongated along the longitudinal direction of the main girder 10, are provided between the respective cross girders 11 and 11, and the form 19 for the floor slab is supported by the timbering 17 which is arranged on the temporary girder, so that the concrete floor slab can be placed. COPYRIGHT: (C)2004,JPO&NCIPI
申请公布号 JP2004197347(A) 申请公布日期 2004.07.15
申请号 JP20020364659 申请日期 2002.12.17
申请人 KAWADA INDUSTRIES INC 发明人 SHIMURA TSUTOMU;MUNEMURA MOTOHIRO;MORISHITA HIROYUKI;SUMIYA TSUTOMU;ASHIZUKA KENICHIRO
分类号 E01D2/02;E01D2/00;E01D19/12;E01D21/00;(IPC1-7):E01D2/02 主分类号 E01D2/02
代理机构 代理人
主权项
地址