摘要 |
A first story log house material is adhered to a base with a coach bolt a nd succeeding log materials after a second story are piled up in turn with clamping bolts. A coach bolt or a clamping bolt has a height corresponding with one long thickness and is equipped with a nut portion and a wahser. This method of assembling l og walls for the log house eliminates the accumulated shrinkage for the log wal l during the drying period. Thus,by the present invention, it is now not necessary to prepare some large size of a side adjusting device and also to reserve some large settling space, both of which are unavoidable in prior art.
|