发明名称 CONSTRUCTION METHOD FOR BRIDGE PIER OF VIADUCT
摘要 PROBLEM TO BE SOLVED: To provide a construction method for a bridge pier of a viaduct, which dispenses with lifting work and high lift work and can minimize the occupancy width of a road etc. required for the construction of a bridge pier girder. SOLUTION: In this construction method for the bridge pier of the viaduct, wherein an upper girder is supported by a column 1, a hollow pile 3 at least almost as long as the column 1 is constructed in ground; the column 1 is inserted into the hollow part of the pile 3; the bridge pier girder 2 of the viaduct is constructed in the upper part of the inserted column 1; after that, the girder 2 and the column 1 are lifted by a jack 4 and turned at a prescribed angle, so as to be supported in a prescribed position; and subsequently, the column 1 is fixed to the pile 3. COPYRIGHT: (C)2004,JPO
申请公布号 JP2004169318(A) 申请公布日期 2004.06.17
申请号 JP20020333782 申请日期 2002.11.18
申请人 KONOIKE CONSTR LTD 发明人 TASHIRO HIROMASA;KASAI HIROSHI;SANO YUICHI
分类号 E02D27/32;E01D19/02;E01D21/00;(IPC1-7):E01D21/00 主分类号 E02D27/32
代理机构 代理人
主权项
地址